Monday, January 19, 2009

Front of House and Yard

Before:After:
Before:
After:
Before:
After:

Finished:
What we did: New siding above garage, painted facia & soffit, new paver walkway, new landscaping, refurbished sprinkler system, new front doors, painted garage doors.

Living Room

Before:
After:
Before:
After:
Hallway: it was carpet, Matthew installed hardwood and tile inlays.
Finished:
What we did: Removed crappy built-in, refinished hardwood floor, textured and painted walls, new light fixture, new furnishings, new trim and painted.

Master Bedroom

Before:
After:

What we did: textured, painted, new light fixture, furnishings.

Second Bedroom (the girls' room)

Before:
After:

What we did: textured, painted, cleaned carpet, furnishings.

Upstairs Bathroom

Before:
After:
Before:
After:

Finished:
What we did: Removed all the garbage, new bath, new faucets and fixed plumbing, new sink/vanity, refurbished the mirror, installed tile floor and surround, new sheet rock, textured & painted walls, new light fixture.

Kitchen

Before:
After:



What we did: refaced the cabinets, new hardware, new faucet, new appliances, installed tile floor and back splash, textured and painted walls, new light fixtures.

Family Room

Before: (pellet stove)
After:
Before:
After:
Before:
Finished:
What we did: fixed sheet rock, textured, painted, cleaned carpet, refurbished pellet stove, tiled under pellet stove, new light, new trim, furnishings.

Third Bedroom (spare room)

Before:

After:

What we did: had egress window installed, textured & painted, cleaned carpet, furnishings.

Fourth Bedroom (our office)

Before:
After:
Before:
After:
What we did: Had egress window installed, textured & painted, cleaned carpet, furnishings.

Downstairs Laundry Area & Bathroom

Before: (Hallway to the laundry & Bathroom)
After:
Before:
After:
Before:
After:
What we did: built walls, sheet rocked, taped, textured, painted, moved water heater, moved air ducts, built doors for laundry room, laid laminate floor.

Before: (Bathroom - if you can call it that)


After:Before:After:

What we did: ripped out old "shower" (that was gross) and carpet (even grosser), put in new tub, laminate floor, walls, textured, painted, new vanity, tub surround, light fixture, door, hardware.